Foundations were required for this new build which was to be constructed on the site of an existing building. It was to consist of traditional brick and flint construction topped off with clay roof tiles. Beam and block ground and first floors which allowed the insulation of underfloor heating to both areas.
All the flint was knapped on site and laid in conjunction with brick quoins to keep in touch with Ibstone's historical heritage with flint buildings and garden walls. Extensive landscaping to the garden areas including brick garden walls and reconstructed stone paving was required to finish off the property.
The FMB MasterBond scheme is operated by the National Register of Warranted Builders (FMB) Ltd (NRWB), a subsidiary of the Federation of Master Builders | visit FMB website
We guarantee the very highest level over the quality of our workmanship leaving customers with complete peace of mind. As an extension of this we are proud to be registered with the FMB as a Master Bond Member.
We are pleased to announce that we have been appointed to carry out alterations and extensions to this delightful 5-bed property. The construction will be based on the fact extra living space is required by the clients, including a gymnasium.